Reference list

Project Customer Location Put in operation
Design documentation of furnace Koch - Glitsch, a.s Novopolock Belarus 1999-2000
Project Customer Location Put in operation
Participation at operational design ČEZ Novopolock Belarus 1995-2000
Project Customer Location Put in operation
Design documentation of columns Koch - Glitsch, a.s Niznevartovsk, Russia 1999-2000
 
Design documentation of columns - Koch - Glitsch, a.s - Niznevartovsk, Russia - 1999-2000 Design documentation of columns - Koch - Glitsch, a.s - Niznevartovsk, Russia - 1999-2000 Design documentation of columns - Koch - Glitsch, a.s - Niznevartovsk, Russia - 1999-2000 Design documentation of columns - Koch - Glitsch, a.s - Niznevartovsk, Russia - 1999-2000
Project Customer Location Put in operation
Design of transfer line Koch – Glitsch, a.s. Rjazan Russia 2000
Project Customer Location Put in operation
Design documentation of cupola Teplotechna Železárny Štěpánov 2001
Project Customer Location Put in operation
Technical design of cooling and air conditionong Teplotechna Železárny Štěpánov 2001
Project Customer Location Put in operation
Design documentation of heat exchangers Koch – Glitsch Novopolock Belarus 2001
Project Customer Location Put in operation
Technical design of furnace Koch – Glitsch Novopolock Belarus 2001
Project Customer Location Put in operation
Design of Transfer line Koch – Glitsch Novopolock Belarus 2001
Project Customer Location Put in operation
Design of storage vessels Chepos Engineerig Iraq 2001
Project Customer Location Put in operation
Design of oil storage tanks Lavimont Škoda Mladá Boleslav 2001
Project Customer Location Put in operation
Design documentation of heat exchangers Ondřejovické strojírny Ondřejovice 2002
Project Customer Location Put in operation
Design documentation of furnaces Kočka Engineering Novi Sad – Serbia 2002
Project Customer Location Put in operation
Technical design of apparatuses for hydrocrack Koch Glitsch Novopolock Belarus 2002-2003
 
Technical design of apparatuses for hydrocrack - Koch Glitsch - Novopolock Belarus - 2002-2003 Technical design of apparatuses for hydrocrack - Koch Glitsch - Novopolock Belarus - 2002-2003 Technical design of apparatuses for hydrocrack - Koch Glitsch - Novopolock Belarus - 2002-2003 Technical design of apparatuses for hydrocrack - Koch Glitsch - Novopolock Belarus - 2002-2003 Technical design of apparatuses for hydrocrack - Koch Glitsch - Novopolock Belarus - 2002-2003
Project Customer Location Put in operation
Design of columns K1,2,4 Koch Glitsch Tuapse Refinery – Russia 2003
Project Customer Location Put in operation
Design of exchangers Koch Glitsch Hydrocrack Novopolock 2003
Project Customer Location Put in operation
Design of apparatuses – columns and vessels Koch Glitsch Hydrocrack Novopolock 2003
Project Customer Location Put in operation
Detail design of pipeline and plumbing TCPA Kajima Europe B.V. TPCA Kolín 2003
Project Customer Location Put in operation
Design of sanitary pipelines installation Kajima TPCA Kolín 2003
Project Customer Location Put in operation
Design of Coke drums Koch Glitsch Turkmenbashi Turkmenistan 2003
Project Customer Location Put in operation
Design of pressure and leakage tests and cleaning operations after assembly Škoda JS Sosnogorsk Russia 2004
Project Customer Location Put in operation
Design of boiler reconstruction DESTRA Chropyně 2004
Project Customer Location Put in operation
Design of heat exchangers-condensers Koch Glitsch Kstovo Russia 2004
Project Customer Location Put in operation
Design documentation – steam distribution Delta bakery Brno 2004
Project Customer Location Put in operation
Design of film evaporator VÚCHZ NPP Mochovce Slovakia 2004
Project Customer Location Put in operation
Technological study – NICOL G Battery production line building Bochemie Ostrava 2004
Project Customer Location Put in operation
Technical design – reconstruction of furnace P2 Koch Glitsch Novopolock Belarus 2004
Project Customer Location Put in operation
Design documentation – BIOETHANOL storage tanks KPS Vrdy 2005
 
Design documentation – BIOETHANOL storage tanks - KPS - Vrdy - 2005 Design documentation – BIOETHANOL storage tanks - KPS - Vrdy - 2005 Design documentation – BIOETHANOL storage tanks - KPS - Vrdy - 2005 Design documentation – BIOETHANOL storage tanks - KPS - Vrdy - 2005
Project Customer Location Put in operation
Technical design – reconstruction of apparatuses AVT-6 Naftan Koch Glitsch Novopolock Belarus 2005
Project Customer Location Put in operation
Design documentation – absorption column Slovnaft Bratislava Slovakia 2005
Project Customer Location Put in operation
Technical design – heat exchangers EMEROL Ltd. Turkmenbashi Turkmenistan 2005
Project Customer Location Put in operation
Design documentation – furnace P3 KG Process Innovations Kochtla-Jarve Estonia 2005
 
Design documentation – furnace P3 - KG Process Innovations - Kochtla-Jarve Estonia - 2005 Design documentation – furnace P3 - KG Process Innovations - Kochtla-Jarve Estonia - 2005 Design documentation – furnace P3 - KG Process Innovations - Kochtla-Jarve Estonia - 2005
Project Customer Location Put in operation
Design documentation – furnace CHEMPEX, MBNS Marinskij Russia 2005
Project Customer Location Put in operation
Design documentation – columns UNIS Basrah Iraq 2006
Project Customer Location Put in operation
Technical designs – reconstruction of vessels KG Process Innovations Pavlodarsk Russia 2006
Project Customer Location Put in operation
Design documentation – furnace P3 convection KG Process Innovations Kochtla-Jarve Estonia 2006
Project Customer Location Put in operation
Design documentation – heat exchangers KPS Daura Iraq 2006
Project Customer Location Put in operation
Design documentation – reactor R5101 UNIS, KPS Basrah Iraq 2006
 
Design documentation – reactor R5101 - UNIS, KPS - Basrah Iraq - 2006 Design documentation – reactor R5101 - UNIS, KPS - Basrah Iraq - 2006 Design documentation – reactor R5101 - UNIS, KPS - Basrah Iraq - 2006 Design documentation – reactor R5101 - UNIS, KPS - Basrah Iraq - 2006
Project Customer Location Put in operation
Technical designs – columns KG Process Innovations Novopolock Belarus 2006
Project Customer Location Put in operation
Design documentation – boiler of distillation column KPS Trmice distillery 2006
Project Customer Location Put in operation
Design documentation – BIOETHANOL storage tanks KORFIL Hustopeče 2007
Project Customer Location Put in operation
Design documentation – separator SP-310 KPS Mazeikiu Lithuania 2007
Project Customer Location Put in operation
Design documentation and production implementation – column KG Italia Novopolock Belarus 2008
Project Customer Location Put in operation
Process units innovation designs KP SAG NPP Mochovce Slovakia 2008
Project Customer Location Put in operation
Participation at operational design KP RIA Diamo Stráž pod Ralskem 2008